VTI Consultants
  • Home
  • Consulting Services
    • Construction Consulting Services
      • Construction Management Services
      • Construction Scheduling Services
      • CPM Scheduling Services
      • Primavera Scheduling Services
      • Microsoft Project Scheduling
      • Change Order Impact
      • Critical Path Method
    • Construction Claims Consulting
      • Acceleration Claims Consultants
      • Labor Productivity Claims
      • Schedule Delay Analysis
      • Time Impact Analysis
      • Window Delay Analysis
      • Earned Value Management
      • Risk Management
    • Shop Drawings Services
      • Steel Shop Drawings
      • Millwork Shop Drawings
      • MEP Shop Drawings
      • Fire Protection Shop Drawings
      • Architectural Shop Drawings
  • Portfolio
    • Clients
  • About Us
    • Locations
      • Florida
      • Texas
      • California
      • New York
      • Colorado
      • Georgia
      • Illinois
      • Arizona
      • Pennsylvania
      • North Carolina
  • Contact Us
  • Get A Quote
  • Menu Menu
info@vticonsultants.com

(813) 708-6333

North Carolina Power Offshore wind farm, Watauga

Big Bend Modernization project, Florida

Florida Power and Light company has selected Blattner Energy and Black and Veatch to install their eight new universal solar projects.

Portfolio Categories

  • Airports
  • Federal Projects
  • Commercial Buildings
  • Healthcare
  • Higher Education
  • K-12 Education & School Projects
  • Marine Construction
  • Pharmaceutical Facilities
  • Power Plants
  • Public Buildings
  • Residential and Mixed-use Buildings
  • Roadways and Bridges
  • Waste Water & Used Oil Treatment Plants

VTI Contractors Inc.


+1 (813) 708-6333
info@vticonsultants.com

Head Office: 941 West Morse Boulevard, Winter Park, FL 32789

Regional Office:

Quick Links

  • Critical Path Method
  • What is CPM Schedule
  • Key steps in Critical Path Method
  • PERT in Critical Path Method
  • Difference between CPM & Baseline Schedule
  • Benefits of Critical Path Method
  • Critical Path Software

Portfolio Categories

  • Airports
  • Federal Projects
  • Commercial Buildings
  • Healthcare
  • Higher Education
  • K-12 Education and School Projects
  • Marine Construction
  • Pharmaceutical Facilities

Connect Online:

  • Skype
  • Pinterest
Copyright © 2021 VTI | All rights reserved.
  • Critical Path Method
  • What is CPM Schedule
  • Key steps in Critical Path Method
  • PERT in Critical Path Method
  • Difference between CPM & Baseline Schedule
  • Benefits of Critical Path Method
  • Critical Path Software
Scroll to top